Our Services
Post Tension
Post tension is a technique of reinforcing the concrete by applying force opposite to the actual loads on the structure. This process has been increasingly used for the last 30 years due to its numerous benefits,
which include, economical structural elements, higher productivity, and time efficiency; thus, leading to an overall cost reduction,
Our scope:
- Supply, Install, Stressing and Grouting.
- Value Engineering to transform the Traditional building system to use PT slabs, which lead to Reducing cost, reducing construction time and increasing the durability of the building.





Bidge Bearing & Expansion Joints
These two components are specifically important in the construction of bridges, where the bearings provide a resting surface between bridge piers and deck, and the expansion joints accommodate the movement due to shrinkage, temperature and vibrations,
Our Partner TENSA Provides:
- Bearings Type “Rubber bearings, pot bearings, Cylindrical and spherical bearing”
- Expansion joints “Roads – Railway”.
Cable Stayed Systems
- Our partner TENSA started developing its technology for cable stayed bridges in the late 80S.
- TENSA has completed more than 40 cable stayed bridges during the last 22 years using parallel strand system.



Construction Equipment for Bridges
- In more than 35 years of activity, Our partner has provide a very wide range of equipment from them “launching girder, cantilever carriage, gantry crane and transporters”
- This equipment always helps to finish works with Perfect Quality, less mistakes and minimum, this lead at the end to reduce the total cost
Structural Monitoring Systems
A procedure to assess the fact of condition of the structure, by defning a risk index based on the vulnerability of the work, which in turn depends on the vulnerability of each structural component.
- Through our Italian partner “Builti s.r.l”, we provide a multi-platform management system “Bridgin-IT”
- That supports the professional Engineer and the infrastructure manager and the Decision Makers, in the planning of maintenance activities with a clear indication of the resource allocation.
- This equipment provides solutions for bridges and viaducts implementation problems; thus, easing and increasing the productivity, and reducing time and cost.